石家庄ZM-1水箱消毒机器厂家,,
1、水池中的水长时间停留在水箱当中容易滋生各种细菌,绿藻,红线虫等,从而严重影响人体体质,针对此情况,我公司推出石家庄ZM-1水箱消毒机器来解决此问题。
2、本设备安装时借助于水箱、水池入孔,无特殊情况,无需破坏水箱、水池、管路等原系统设施。
一、石家庄ZM-1水箱消毒机器安装程序为:
①、必须将水箱、水池清理干净。
②、将消毒循环器(不锈钢球)放于水箱、水池底部即可,有多台消毒器时应均匀布置。
③、控制柜挂装在墙上,它必须安装在防雨、防水措施的干燥通风处并且严禁被水溅湿。设备离地面>1.5米。(略高于水箱)
④、建议在水箱、水池的顶盖上,消毒循环器放置上方1米半径范围内预留一个直径50mm(供消毒循环器传输线出线)的圆形电缆出线孔。
⑤、将消毒循环器的电缆从上述电缆出线孔引出至控制柜旁,在圆孔处将电缆固定。
⑥、将消毒循环器的电缆与控制柜接线端子相连接;将循环器接出的白色软管与控制柜内的软管相连,用电工胶带密封住接口。
⑦、将220V/50Hz电源与控制柜相连接。经过上述操作后,本设备安装结束。
二、 石家庄ZM-1水箱消毒机器的开机方法:
1、向水箱或水池注水,使水位淹没消毒器(必须淹没)。
2、打开控制柜门,将空开合上。此时,控制柜门上的电源指示灯和工作指示灯都将点亮,说明设备已开始正常工作。
3、时间继电器的调节:左边为开机时间,右边是停机时间,一般为开停比例为1比3,如开10分钟停30分钟。
三、石家庄ZM-1水箱消毒机器的停机方法:
1、 打开控制柜的门。
2、将电源总开关断开。此时电源指示灯和工作指示灯都将熄灭,说明设备已停止工作。
Shijiazhuang WTS
1, cistern is long time stay in water tank tend to produce of all sorts of bacteria, green algae, red nematodes, thus seriously affect human body constitution, in view of this situation, I introduced shijiazhuang WTS
2, the equipment installation by pool water tank, when the hole, no special circumstances, unnecessary damage tank, and pools, pipeline, etc the original system facilities.
A,
(1), will have to clean up the water tank, and pools.
(2), disinfection cycle device (stainless steel ball) put in the tank, and pools center bottom can, how should decorate a sterilizer evenly.
(3) hang on the wall, cabinet put, it must be installed in the rain, waterproof measures of dry and ventilated place it is strictly prohibited to be the water splashed wet. Equipment from the ground > 1.5 meters. (best slightly above the water tank)
(4), Suggestions in water tank, that pool, disinfection is placed above
(5), disinfection of cable from the above the circulation cable outlet to draw out the hole control cabinet, in the round hole will cable fixed.
6, disinfection of cable and the cycle control cabinet connected terminals; Pick out the cycle of the white hose and control of the inside ark hose, with electrical tape sealing live interface.
7, 220 V/frequency 50 Hz power in connection with the control cabinet. After the operation, the equipment installation ends.
Second,
1, to the water tank or pool water injection, to bring the level submerged disinfector (must be submerged).
2, open cupboard door control, will close on empty. At this time, the indicator of the cupboard door control and work will be lit indicator that equipment has started to work properly.
3, time relay regulation: the left for boot time, on the right is the down time, generally for open stop proportion is 1 than 3, such as opening 10 minutes stop 30 minutes.
Three,
1, open the door of the cabinet.
2, will always switch power supply. At this time of the indicator lights and work will be put out, explain equipment has stopped working.
所有评论仅代表网友意见,与本站立场无关。